top of page
IMG-20240918-WA0103_edited.jpg

CHEVRON GC LABORATORY RENOVATION

Malongo, Angola

Client

Contractor

Size

Completion

Construction Cost

Delivery Method

Services provided

Chevron

TBD

12,000 sf renovation

Anticipated late 2020

$8,500,000

TBD

Full Architectural Services

Laboratory Planning  Services

Precision Architecture traveled to Angola to assess existing refinery laboratory spaces across two buildings and develop a program and bridging documents for a new consolidated QA/QC laboratory facility.

​

Due to the remote location, careful product selection was essential to minimize maintenance needs and account for long lead times on replacement parts. The design includes high-purity gas generators, lab waste containment, redundant HVAC systems, and a large Hâ‚‚S dry scrubber to support continuous and safe operations.

​

A hazardous chemical storage and dispensing area was designed to meet electrical classification requirements, with life safety and code compliance guiding every aspect of the project.

  • facebook
  • linkedin
logo_logomark_no_background.png

©2019 by Precision Architecture, Inc.

bottom of page