top of page

MASTHERCELL US HEADQUARTERS

WEBSTER, TX

Client

Contractor

Size

Completion

Construction Cost

Delivery Method

Services provided

MaSTherCell

Jacob White Construction

30,000 sf renovation

Anticipated late 2019

$8,000,000

Design-Build

Full Architectural Services

Laboratory Consulting

PA was challenged with integrating cleanrooms and open-concept laboratories into a building that was never intended for such specialized use. Originally constructed without a sprinkler system, the project required the addition of code-compliant fire suppression systems to support the desired open lab layout and glass-walled cleanroom corridors—which also served as emergency egress routes due to space constraints. PA worked closely with the Webster Fire Marshal to resolve several longstanding life safety and combustibility issues. With only 13 feet of floor-to-floor height, the team executed a highly coordinated design to successfully accommodate the cleanrooms and their complex mechanical systems within the limited vertical space.

  • facebook
  • linkedin
logo_logomark_no_background.png

©2019 by Precision Architecture, Inc.

bottom of page